Renovations

Why winter is the best season to renovate

Manitas Team6 min read
Home renovation work in progress

The practical reason: timescales are real

From March to June, every trade in the area has a diary full of people wanting the house ready before summer. The dates quoted in that period are the ones that hold only with luck.

In November and December the diaries breathe. The same renovation gets planned with dates that stand up, and if something unexpected appears behind a partition there is room to deal with it without squeezing the rest.

Materials breathe too

In peak season a particular tile or a specific worktop can carry a six-week lead time, and the calendar ends up depending on the supplier rather than the builder.

Out of season, availability is better and the choice wider. That means fewer decisions taken by elimination, which is what people regret for the next fifteen years.

What winter allows and summer does not

Painting, plastering and floor laying need to dry at a sensible rate. In August at thirty-five degrees the material dries too fast, and stresses and hairline cracks follow.

The Costa Blanca winter is mild: moderate temperatures and low humidity most of the time. Those are better conditions than July for almost anything that has to set.

And what is worth waiting for

Not everything suits winter. Waterproofing a terrace needs several consecutive dry days, and in November or March that is a gamble. The same goes for a façade.

There the logic reverses: exteriors in early spring or a dry autumn, interiors in winter. A well-built programme separates the two rather than treating the project as one block.

For a property used seasonally

If the house is used in summer and sits empty from November to April, winter is precisely the window when the work disturbs nobody. It is when the whole kitchen can be done without giving up cooking.

It needs someone to open up, follow the work and lock up. But that is the difference between arriving in June to a finished house and arriving in June to a house with the work just started.

Renovations in your town

The survey is free and the quote is fixed after it. You will find what we do in each area on our renovation pages for Torrevieja, Ciudad Quesada, Orihuela Costa, Guardamar, Santa Pola and Pilar de la Horadada, and the full service on renovations.

Frequently asked questions

Can you renovate in winter on the Costa Blanca?

Yes, and it is the best season for interiors: moderate temperatures, correct drying and trades with availability.

What work is best not done in winter?

Exterior work that depends on several consecutive dry days: terrace waterproofing, façades, exterior painting.

Are timescales shorter out of season?

Mostly they are more reliable. The real difference is that a date given in November is met.

My house is empty in winter, is that a problem?

The opposite, it is the best window. You need someone to open up, supervise and lock up, and that is organised.

Prefer us to handle it?

We cover the whole Vega Baja with a free quote and fast response.